Lots of progress was made this christmas weekend.
- The roof plywood triangle pieces were cut and screwed on.
- Stain/sealer was applied to "most" of the plywood siding
- 1x4 trim was cut, painted, and nailed on the front of the shed
- made a plywood ramp for the entrance
- The roof plywood triangle pieces were cut and screwed on.
- Stain/sealer was applied to "most" of the plywood siding
- 1x4 trim was cut, painted, and nailed on the front of the shed
- made a plywood ramp for the entrance
Next step will be to finish staining, more trim work, and make the doors
No comments:
Post a Comment